July 27, 2024
UPSTREAM: ExxonMobil makes two more discoveries offshore Guyana
ExxonMobil Launches Investigation Into Near-miss Accident on Hebron Platform
– By Godswill Odiong

Kindly Share

Facebook
Twitter
LinkedIn
WhatsApp

By Eyo Nsima
ExxonMobil has made two new discoveries offshore Guyana to the southeast of the Liza and Payara developments in the Stabroek block, thus increasing its reserves.

The discoveries at Seabob and Kiru-Kiru are the sixth and seventh in Guyana this year, with the total number of discoveries in Guyana at more than 25.

Guyana investment strategy continues to yield positive results; additional exploration wells planned later this year.
Production from two vessels currently operating offshore has exceeded their initial combined target of 340,000 barrels per day.

The Seabob-1 well encountered approximately 131 feet (40 meters) of high-quality hydrocarbon-bearing sandstone and was drilled in 4,660 feet (1,421 meters) of water by the Stena Carron drill ship.

The Kiru-Kiru-1 well encountered approximately 98 feet (30 meters) of high-quality hydrocarbon-bearing sandstone and was drilled by the Stena DrillMAX in 5,760 feet (1,756 meters) of water. Drilling operations at Kiru-Kiru are ongoing.
“ExxonMobil and its partners continue to accelerate exploration, development and production activities for the benefit of all stakeholders, including the people of Guyana,” said Liam Mallon, president of ExxonMobil Upstream Company.

“The resources we are investing in and discovering offshore Guyana will provide safe, secure energy for global markets for decades to come.”
The company’s 2022 investment plans include further exploration drilling and resource development in Guyana, where it is already increasing production at an accelerated, industry-leading pace.
Two floating production storage and offloading (FPSO) vessels operating offshore Guyana — Liza Destiny and Liza Unity — have exceeded their initial combined production target of 340,000 barrels of oil per day.
A third project, Payara, is expected to produce 220,000 barrels per day. Construction on its production vessel, the Prosperity FPSO, is approximately five months ahead of schedule with start-up likely before year-end 2023.
The fourth project, Yellowtail, is expected to produce 250,000 barrels per day when the ONE GUYANA FPSO comes online in 2025.

Guyana’s Stabroek block is 6.6 million acres (26,800 square kilometers). ExxonMobil affiliate Esso Exploration and Production Guyana Limited is the operator and holds 45% interest in the block.
Hess Guyana Exploration Ltd. holds 30% interest, and CNOOC Petroleum Guyana Limited holds 25% interest.

Kindly Share

Facebook
Twitter
LinkedIn
WhatsApp

Copyright @ TheDaily. All rights reserved. This material, and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior express written permission from TheDaily

Leave a Comment

Your email address will not be published. Required fields are marked *

📰 Subscribe to our Newsletter

Scroll to Top