ANGOLA: Total begins production from Zinia phase 2, developing Block 17
ANGOLA: Total begins production from Zinia phase 2, developing Block 17 Total, operator of Block 17 in Angola, together with the Angolan National Oil, Gas and Biofuels Agency, announce the start of production from Zinia Phase 2 short-cycle project, connected to existing Pazflor’s FPSO (Floating Production, Storage, and Offloading unit). The project includes the drilling […]
ANGOLA: Total begins production from Zinia phase 2, developing Block 17 Read More »







