Peak Generation — 4948.57MW
Lowest Generation — 4210.3MW
Energy Generated — 113304.12MWH
Energy Sent Out — 111767.03MWH
Generation — 4742MW
Highest System Frequency — 50.796Hz
Lowest System Frequency — 49.068Hz
Highest Voltage Recorded — 345kV
Lowest Voltage Recorded — 292kV
National Peak Demand Forecast— 19798MW
Grid Generation Installed Capacity— 13,014.14MW
Generation Capacity — 7,652.6MW
Transmission Wheeling Capacity — 8,100MW
All Time Peak Generation Ever Attained — 5801.6MW
Maxmum Daily Energy Ever Attained — 119471.15MWH
.As of March 17, 2023