TCN upgrades Egbin 330/132/33KV Substation with 60MVA 132/33KV power transformer
– By Godswill Odiong

Kindly Share

Facebook
Twitter
LinkedIn
WhatsApp

TCN has upgraded its Egbin 330/132/33kV Transmission Substation with the installation of a 60MVA 132/33kV power transformer. The transformer which was installed by TCN in-house engineers was energized at about 13.05pm on the 2nd of March 2022.

With the new 60MVA power transformer, the substation capacity to supply bulk electricity to Ikeja Electricity Distribution company has increased by 30MVA. This is because TCN has decommissioned an old 30MVA transformer within the substation, which will be serviced and moved to other areas within its network that has a history of minimal electricity demand.

This substation capacity upgrade will ensure that more power is made available for IKEDC to take to its franchise areas within Ijeda LCDA and Ikorodu Local Government area axis.

Kindly Share

Facebook
Twitter
LinkedIn
WhatsApp

Copyright @ TheDaily. All rights reserved. This material, and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior express written permission from TheDaily

Leave a Comment

Your email address will not be published. Required fields are marked *

📰 Subscribe to our Newsletter

Scroll to Top